2016.07.08 - 8 Hours - sheet rock and mud
2016.07.07 - 8 Hours - sheetrock
2016.07.05 - 8.5 Hours - Temp Wall Removal, Sheet Rock Demo in living room
2016.07.01 - 7.5 Hours - Caulking, Header Install, Floor Cleaning for Flooring Install
2016.06.30 - 7 Hours - Priming Studio and Bathrooms
2016.06.28 - 7.5 Hours
Payment math for 6/27
8+7.5+7+7+7.5+7.5 +7.5+8+9.5+7
76.5×20 = 1,530
1,530+30+63.36
1,623.36 (Owed to date)
- 1300.00 Paid 6/27
323.00 Left for 6/27 Payment
- 300.00 Paid 6/28
23.00 Left for 6/27
---
2016.06.27 - 7 Hours
2016.06.24 - 9.5 Hours - Painting, Mudding, Water Putty, Caulking
2016.06.23 - 8 Hours
2016.06.17 - 7.5 Hours - Painting, Cleaning
2016.06.14 - 7.5 Hours - Water putty, Window Pickup, cleanup, Mudd mix
2016.06.14 - Receipt 63.36 - Mudd and 2x3:
2016.06.13 - 7.5 Hours - Caulking and Plastering
2016.06.10 - 7 Hours - Caulking
2016.06.07 - 7 Hours - Finished paint prep for master bedroom, cleaning, insulation.
2016.06.03 - 7.5 Hours - Sanding master bedroom, caulking studio, cleaning
2016.05.31 - 8 Hours - studio wall prep for paint, caulking, bathroom wall and sink pickup
2016.05.31 - $30 Truck usage.
2016.05.30 - Paid to date.
2016.05.27 - 8 Hours
2016.05.27 Expenses - 295.93 5 Gal white, 5 Gal grey exterior paint. ($80 in rebates! Be sure to send in!)
2016.05.24 - 8 Hours - Bathroom framing, plumbing help, backing.
2016.05.20 - paid to date.
Total Hrs Not Paid as of 5/17: 27 + $46 Incidentals
2016.05.20 - $14 Truck Usage
2016.05.20 - 5 Hours - Dirt Moving, Floor Pulling (finished!), and cleaning.
2016.05.17 - 7 Hours - Dirt Moving and Leveling / Floor Pulling
2016.05.13 - 8 hours - 2 loads of dirt, sliding door pickup, and general cleaning.
2016.05.13 - $30 for truck gas and usage
2016.05.13 - $16 dump fee
2016.05.10 - 7 hours