Joe Morishge - 574 Work Projects: Difference between revisions
Jump to navigation
Jump to search
Morishigejoe (talk | contribs) No edit summary |
Morishigejoe (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
== Projects to work on: == | == Projects to work on: == | ||
Weed thorns and sticky stuff from the left side of redwood grove. | |||
Drainage setup in front of main house entrance. | |||
Rock re-enforcement of back path. (Zone something or rather um...) | |||
== Projects to w3ork on: == | |||
Weed thorns and sticky stuff from the left side of redwood grove. | Weed thorns and sticky stuff from the left side of redwood grove. |
Revision as of 11:40, 7 May 2016
Work Thus Far:
2016.05.07 - 1.5 Hours of brush and dirt moving.
02.08-02.12 (4 hours paid out)
2016.02.12 - 1 Hour of rock moving.
2016.02.08 - 2 Hours of weeding (What was that called again?)
2016.02.08 - 1 Hour of slicing and dicing coyote bush.
Projects to work on:
Weed thorns and sticky stuff from the left side of redwood grove.
Drainage setup in front of main house entrance.
Rock re-enforcement of back path. (Zone something or rather um...)
Projects to w3ork on:
Weed thorns and sticky stuff from the left side of redwood grove.
Drainage setup in front of main house entrance.
Rock re-enforcement of back path. (Zone something or rather um...)