Joe Morishge - 574 Work Projects: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
Morishigejoe (talk | contribs) No edit summary  | 
				Morishigejoe (talk | contribs) No edit summary  | 
				||
| Line 1: | Line 1: | ||
'''Work Thus Far:'''  | == '''Work Thus Far:''' ==  | ||
2016.05.07 - 1.5 Hours of brush and dirt moving.  | 2016.05.07 - 1.5 Hours of brush and dirt moving.  | ||
| Line 11: | Line 11: | ||
2016.02.08 - 1 Hour of slicing and dicing coyote bush.  | 2016.02.08 - 1 Hour of slicing and dicing coyote bush.  | ||
'''Projects to work on:'''  | == '''Projects to work on:''' ==  | ||
Weed thorns and sticky stuff from the left side of redwood grove.    | Weed thorns and sticky stuff from the left side of redwood grove.    | ||
Revision as of 10:35, 7 May 2016
Work Thus Far:
2016.05.07 - 1.5 Hours of brush and dirt moving.
02.08-02.12 (4 hours paid out)
2016.02.12 - 1 Hour of rock moving.
2016.02.08 - 2 Hours of weeding (What was that called again?)
2016.02.08 - 1 Hour of slicing and dicing coyote bush.
Projects to work on:
Weed thorns and sticky stuff from the left side of redwood grove.
Drainage setup in front of main house entrance.
Rock re-enforcement of back path. (Zone something or rather um...)