Joe Morishge - 574 Work Projects: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
Morishigejoe (talk | contribs) No edit summary  | 
				Morishigejoe (talk | contribs)  | 
				||
| (10 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
== Work Thus Far: ==  | |||
2016.05.25 - Paid to date.  | |||
2016.05.25 - 5 Hours of shop ground prep.  | |||
2016.05.23 - 3 Hour of shop ground prep.  | |||
2016.05.07 - 1.5 Hours of brush and dirt moving.  | |||
02.08-02.12 (4 hours paid out)  | |||
2016.02.12 - 1 Hour of rock moving.  | 2016.02.12 - 1 Hour of rock moving.  | ||
| Line 6: | Line 16: | ||
2016.02.08 - 1 Hour of slicing and dicing coyote bush.  | 2016.02.08 - 1 Hour of slicing and dicing coyote bush.  | ||
== Projects to work on: ==  | |||
Weed thorns and sticky stuff from the left side of redwood grove.   | |||
Drainage setup in front of main house entrance.  | Drainage setup in front of main house entrance.  | ||
Rock re-enforcement of back path. (Zone something or rather um...)  | Rock re-enforcement of back path. (Zone something or rather um...)  | ||
Latest revision as of 10:03, 26 May 2016
Work Thus Far:
2016.05.25 - Paid to date.
2016.05.25 - 5 Hours of shop ground prep.
2016.05.23 - 3 Hour of shop ground prep.
2016.05.07 - 1.5 Hours of brush and dirt moving.
02.08-02.12 (4 hours paid out)
2016.02.12 - 1 Hour of rock moving.
2016.02.08 - 2 Hours of weeding (What was that called again?)
2016.02.08 - 1 Hour of slicing and dicing coyote bush.
Projects to work on:
Weed thorns and sticky stuff from the left side of redwood grove.
Drainage setup in front of main house entrance.
Rock re-enforcement of back path. (Zone something or rather um...)