Joe Morishge - 574 Work Projects: Difference between revisions
Jump to navigation
Jump to search
Morishigejoe (talk | contribs) No edit summary |
Morishigejoe (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Work Thus Far: == | == Work Thus Far: == | ||
2016.05.25 - Paid to date. | |||
2016.05.25 - 5 Hours of shop ground prep. | |||
2016.05.23 - 3 Hour of shop ground prep. | |||
2016.05.07 - 1.5 Hours of brush and dirt moving. | 2016.05.07 - 1.5 Hours of brush and dirt moving. |
Latest revision as of 11:03, 26 May 2016
Work Thus Far:
2016.05.25 - Paid to date.
2016.05.25 - 5 Hours of shop ground prep.
2016.05.23 - 3 Hour of shop ground prep.
2016.05.07 - 1.5 Hours of brush and dirt moving.
02.08-02.12 (4 hours paid out)
2016.02.12 - 1 Hour of rock moving.
2016.02.08 - 2 Hours of weeding (What was that called again?)
2016.02.08 - 1 Hour of slicing and dicing coyote bush.
Projects to work on:
Weed thorns and sticky stuff from the left side of redwood grove.
Drainage setup in front of main house entrance.
Rock re-enforcement of back path. (Zone something or rather um...)