Difference between revisions of "Joe Morishige - Mountain Hours"

From Sharemoon.pub ~ Community System Blueprint
Jump to: navigation, search
Line 2: Line 2:
  
 
September 2015:
 
September 2015:
 +
 
2015.09.02 - 4 hours fertilizing
 
2015.09.02 - 4 hours fertilizing
  

Revision as of 21:19, 5 September 2015

The following work was never done for cash money but instead for a barter for a living situation.

September 2015:

2015.09.02 - 4 hours fertilizing

2015.09.03 - 2 Hours bee keeping

2015.09.04 - 2 Hours fertilizing

2015.09.05 - 6 hours fertilizing

2015.09.

Other pocket costs:

$30 liquid kelp

$30 liquid fish

$30 pellets 442 true (fish, kelp, etc)

$? - yucca root

$10 rice straw bale



August:


My records show that I was 7.5 hours under for June (Which should have owed $150 at this point)

However, the following projects were done between June and July:

  • Clearing Bee Hive Location
  • Moving Bee Hives to Current Location
  • Irrigation of Apple Orchard
 - Researching and purchasing materials
 - Laying PVC from my location to Main Orchard
 - Laying PVC from my location to Pear spot
 - Installing Drip Lines, Drips, Timers, ETC.
  • Laura's bee work with you (Although this has yet to be discussed I don't expect Laura to be doing this for free, if you disagree please let me know.)
  • Hand watering entire orchard 2 times

Unfortunately I feel my lack of formally calculating these hours may in some part be causing your unhappiness with me. With these projects taken into account I feel confident that the work I have done should be enough to cover rent until the end of August. If you feel otherwise and would rather me try and make a detailed account of each hour and action I will do so.

May:

32.5 Hours Rolled in from April

- 25.00

---

7.5 Rolled in from previous month


5/27 - 1.5 Orchard watering

5/7 - 2 Hours tlc for survey

5/6 - 5 hours final nailing and coup paint

5/? - 2 Hours of Roust about work to make Coupe copacetic for obvious reasons.


18 Hours Total at end of may.


April:

4/29 - 7 Hours painting

4/28 - 9 Hours painting

4/21 - 2 Hours roof work

4/20 - 7 hours general coup work

4/11 - 7 hours, loft framing, lathe, chicken wire, face board.

32 Work hours total for April

+ 25.5 hours (over hours from previous month)

- 25.00 hours (May Rent)

32.5 Extra Hours to roll into next month


3/31 - 6 hours buying and painting 2 layers of stain

3/30 - 2.5 hour nailing siding

3/28 - 3 hour nailing hurricane holdsownshold downs

3/20 - 1 hour planting cherry tree

3/16 - 1 hour watering garden 3/16 - 5 hours concrete work

3/9 - 2 Hours - cherry planting, watering, sanding

3/6 - 1 hour rebar pickup 3/6 - 4 hours finishing mulching and initial water

3/4 - 1 Hours mulching and watering 3/4 - 1 hour helping with coup

3/3 - 3 hours working with Craig on chicken coup. Building slab frame, leveling, etc. 3/3 - 2 Hours mulching and watering orchard.

---

31.5 hours total worked in march.

+ 19 over hours from February l.

50.5 hours balance.

- 25 hours (April Rent)

--- 25.5 hours (rolled into next month)

-

2/9 - 2 Hours staking and hill prep. 2/11 - 6.5 hours holing and hill grooming 2/12 - 4 hours holing and hill grooming 2/13 - 2.5 hours holing and grooming 2/16 - 9 hours making holes 2/17 - 6 hours making holes 2/18 - 5 hours planting 2/19 - 9 hours planting

44 hours (25 hours for March rent, 19 hours rolled into next month)

-

1/6 - 1 hour clearing 1/7 - 4 hours clearing 1/8 - 1.5 hours clearing 1/9 - 3.5 hours clearing 1/13 - 5 hours of clearing 1/27 - 6 hours of burning 2/3 - 3 hours hill side clearing during excavation 2/4 - 1 hours clearing post excavation

Total 25 hours (February rent)

12/9 - 7hrs. Drain pipe and fencing takedown. 12/17 - 6 Hrs. Spreading Gravel 12/19 - 4 Hours - Moving brush down for fire. 12/19 - 2 Hours - Trench Digging

December Total: 19

Other tasks left to do: Bury water pipe to garden Pile cut acacia at burn pile